Reference and changes
Identify the base model or design version. Mark dimensions, material, trim and construction choices so that every change has a clear approval reference.
UNDERWEAR MANUFACTURING
Adapt an existing model with a defined change list. Keep the base model as the reference while reviewing colour, fabric, dimensions and garment details.
Identify the base model or design version. Mark dimensions, material, trim and construction choices so that every change has a clear approval reference.
Provide logo files, label text, colours, size and position. Confirm required market information and review a sample before production.
Share your style, colour and size quantities, packaging count, destination and required date. The quote sets the final sample and production schedule.
| Cooperation | Reference MOQ | Sample | Dispatch / production |
|---|---|---|---|
| Ready stock wholesale | 200 pieces | About 3 days | 3–7 days |
| Private label | 500 pieces / style | 3–7 days | 20–30 days after sample approval |
| Modify existing styles | 1,000 pieces / style / colour | 7–10 days | 30–45 days after pre-production sample approval |
| Full OEM / ODM | 3,000 pieces / style / colour | 7–10 days | 30–45 days after pre-production sample approval |
These planning conditions guide your inquiry. Final availability, quantity allocation and dates are stated in the written quotation. Production timing starts after the required approvals and deposit; full development also needs a design and material schedule.
Bring fit comments, colours, components, label artwork and packing details into one final specification. Approve the PP sample and the written order so that manufacturing and inspection use the same reference.