UNDERWEAR MANUFACTURING

Shapewear manufacturer

Plan body coverage, fit and your required support or compression specification.

Ready stock from 200 pcs · Private label from 500 pcs/style · Samples in 3–7 days

Sewing work area at the AIMEXAN factory in Gurao, Shantou.
Sewing work area

Describe the body coverage and fit objective

Finished shapewear is produced and held in stock. Ask for the current garment options and specify coverage, target wearer, size range and the support you intend to offer. Review the sample for entry, movement, closures and inside surfaces. If the product will carry a quantified compression or other functional statement, define the method and supporting evidence for the selected garment before using that statement in marketing.

Define your garment requirements

Garment and wearer

Send the intended use, coverage and target size range. Include a reference style or sketch and explain the fit you want to achieve.

Construction and materials

Specify the production method, fabric, components and edge finish. Confirm the exact construction of the selected model in the sample specification.

Order and branding

Tell us the required quantities, colours, labels and packing format. Ready stock and development routes are reviewed for your product brief.

Agree the functional specification

Record the layer or support construction, intended use, care method and the performance you need. Define a test method and the evidence needed for any absorption, leakage or compression claim before using it in your own marketing.

Sample and cooperation options

CooperationReference MOQSampleDispatch / production
Ready stock wholesale200 piecesAbout 3 days3–7 days
Private label500 pieces / style3–7 days20–30 days after sample approval
Modify existing styles1,000 pieces / style / colour7–10 days30–45 days after pre-production sample approval
Full OEM / ODM3,000 pieces / style / colour7–10 days30–45 days after pre-production sample approval

These planning conditions guide your inquiry. Final availability, quantity allocation and dates are stated in the written quotation. Production timing starts after the required approvals and deposit; full development also needs a design and material schedule.