Garment and wearer
Send the intended use, coverage and target size range. Include a reference style or sketch and explain the fit you want to achieve.
UNDERWEAR MANUFACTURING
Request finished stock and define coverage, layer construction and test requirements.
Ready stock from 200 pcs · Private label from 500 pcs/style · Samples in 3–7 days

Finished period underwear is part of our production and stock offering. Request the current styles and define the intended use, coverage, layer construction and size allocation. Agree the care information and the evidence required for any absorption or leakage statement. A category name does not establish a measured capacity. Use the chosen finished garment and its applicable test method as the basis for your own product claim.
Send the intended use, coverage and target size range. Include a reference style or sketch and explain the fit you want to achieve.
Specify the production method, fabric, components and edge finish. Confirm the exact construction of the selected model in the sample specification.
Tell us the required quantities, colours, labels and packing format. Ready stock and development routes are reviewed for your product brief.
Record the layer or support construction, intended use, care method and the performance you need. Define a test method and the evidence needed for any absorption, leakage or compression claim before using it in your own marketing.
| Cooperation | Reference MOQ | Sample | Dispatch / production |
|---|---|---|---|
| Ready stock wholesale | 200 pieces | About 3 days | 3–7 days |
| Private label | 500 pieces / style | 3–7 days | 20–30 days after sample approval |
| Modify existing styles | 1,000 pieces / style / colour | 7–10 days | 30–45 days after pre-production sample approval |
| Full OEM / ODM | 3,000 pieces / style / colour | 7–10 days | 30–45 days after pre-production sample approval |
These planning conditions guide your inquiry. Final availability, quantity allocation and dates are stated in the written quotation. Production timing starts after the required approvals and deposit; full development also needs a design and material schedule.