Product and listing information
Record material composition, garment measurements, size guidance and care details. Match the listing to the supplied product and supporting evidence.
UNDERWEAR MANUFACTURING
Prepare garment specifications, size information, pack labels and your fulfilment requirements.
Record material composition, garment measurements, size guidance and care details. Match the listing to the supplied product and supporting evidence.
Provide your barcode and pack-label artwork, placement and unit-pack requirements. Confirm any marketplace-specific instruction for the destination programme.
Agree carton quantities, shipping marks and delivery scope with your forwarder. Check your current seller-account requirements before confirming the packing specification.
| Cooperation | Reference MOQ | Sample | Dispatch / production |
|---|---|---|---|
| Ready stock wholesale | 200 pieces | About 3 days | 3–7 days |
| Private label | 500 pieces / style | 3–7 days | 20–30 days after sample approval |
| Modify existing styles | 1,000 pieces / style / colour | 7–10 days | 30–45 days after pre-production sample approval |
| Full OEM / ODM | 3,000 pieces / style / colour | 7–10 days | 30–45 days after pre-production sample approval |
These planning conditions guide your inquiry. Final availability, quantity allocation and dates are stated in the written quotation. Production timing starts after the required approvals and deposit; full development also needs a design and material schedule.