UNDERWEAR MANUFACTURING

OEM / ODM underwear development

Develop a new garment from a technical design, sample or product concept. Agree the scope and sample approvals before releasing bulk production.

From garment detail to technical brief

Model 2369 — crossed straps and stitching enlarged from our own garment reference.
Start with a visible garment detail
Model 2388 bra beside a matching front-view sketch (digitally created scene).
Define the design and measurement points

What to include in your brief

Reference and changes

Identify the base model or design version. Mark dimensions, material, trim and construction choices so that every change has a clear approval reference.

Artwork and placement

Provide logo files, label text, colours, size and position. Confirm required market information and review a sample before production.

Quantity and schedule

Share your style, colour and size quantities, packaging count, destination and required date. The quote sets the final sample and production schedule.

Development minimum and timing

CooperationReference MOQSampleDispatch / production
Ready stock wholesale200 piecesAbout 3 days3–7 days
Private label500 pieces / style3–7 days20–30 days after sample approval
Modify existing styles1,000 pieces / style / colour7–10 days30–45 days after pre-production sample approval
Full OEM / ODM3,000 pieces / style / colour7–10 days30–45 days after pre-production sample approval

These planning conditions guide your inquiry. Final availability, quantity allocation and dates are stated in the written quotation. Production timing starts after the required approvals and deposit; full development also needs a design and material schedule.

Approve the full production reference

Model 2388 outer cup and neckline detail (digitally created product study).
Review the outer cup reference

Bring fit comments, colours, components, label artwork and packing details into one final specification. Approve the PP sample and the written order so that manufacturing and inspection use the same reference.

Review all eight order steps ↗

Fields marked * are required.

Add optional project details
Use a link you intend to share for this project.

We use the details you submit to review and follow up on your product inquiry. They are not published on this website.

Checking inquiry availability…