One controlled specification
Combine the buyer’s garment, testing, labelling and packing requirements into a versioned brief. Identify who can approve each milestone.
UNDERWEAR MANUFACTURING
Coordinate specifications, approval records, inspections and shipping documents for your buyer.
Combine the buyer’s garment, testing, labelling and packing requirements into a versioned brief. Identify who can approve each milestone.
Track colour, fit and PP sample decisions in writing. Resolve comments before production release rather than leaving several conflicting references.
Agree the inspection plan, booking responsibilities, shipment term and required documents. Share the nominated forwarder and consignee information at the right stage.
| Cooperation | Reference MOQ | Sample | Dispatch / production |
|---|---|---|---|
| Ready stock wholesale | 200 pieces | About 3 days | 3–7 days |
| Private label | 500 pieces / style | 3–7 days | 20–30 days after sample approval |
| Modify existing styles | 1,000 pieces / style / colour | 7–10 days | 30–45 days after pre-production sample approval |
| Full OEM / ODM | 3,000 pieces / style / colour | 7–10 days | 30–45 days after pre-production sample approval |
These planning conditions guide your inquiry. Final availability, quantity allocation and dates are stated in the written quotation. Production timing starts after the required approvals and deposit; full development also needs a design and material schedule.